2019 Construction Projects

Road Construction

2019 Construction Location Map

Wellington Road 46 (Brock Road), McLean Road to Wellington Road 34

(Township of Puslinch)

Type of Work: Road reconstruction

Timing: May 21 to late November

Impact:  Phase I construction is complete.

Wellington Road 50 (Harris Street), Highway 7 to Railway Tracks

(Township of Guelph/Eramosa)

Type of Work: Road reconstruction

Timing: June 17 to December 11

Impact:  The road is now open and construction is complete for this year.

Wellington Road 51, Wellington Road 7 to to Highway 6

(Township of Guelph/Eramosa)

Type of Work: Road reconstruction

Timing: May 6 to November

Impact: The road is now open and contruction is completed.

 

Bridge and Culvert Construction

Wellington Road 16, Bridge (Box Culvert) B016118

(Township of Wellington North)

Type of Work: Bridge (Box Culvert) replacement

Timing: August 12 to 16

Impact: The road is now open and construction is completed. 

Wellington Road 16, from Line 6 to Line 8, Cross Culvert at Damascus

(Township of Wellington North)

Type of Work: Cross Culvert repair

Timing: July 24

Impact: The road is now open and construction is completed.

Wellington Road 18 (Geddes/Woolwich Street), Salem Bridge B018050 

(Township of Centre Wellington)

Type of Work: Bridge replacement 

Timing: May 14 to late December 

Impact: The road and bridge are now open and construction is complete for this year.  

Wellington Road 21, Badley Bridge B021057 

(Township of Centre Wellington)

Type of Work: Bridge replacement

Timing: January 6, 2020 to November, 2020

Impact: This project consists of the replacement of the Badley Bridge, as well as road reconstruction of Metcalfe Street from East Mill Street to High Street.  The road work is in partnership with the Township of Centre Wellington.  Badley Bridge is now closed for the existing structure removal and will be reopened in November, 2020.  There will be no impact to school buses or garbage and recycling and emergency services will be accomodated; however, there will be no access across the bridge as of January 6, 2020.   There are two detour routes in place during this bridge replacement.  The commercial truck detour route utilizes Wellington Road 7, Wellington Road 18/Woolwich Street, and Metcalfe Street.  The passenger car detour route utilizes Wellington Road 7, David Street West, Geddes Street, and Metcalfe Street.  These detour routes are posted at the construction site taking the travelling public around the project site.  Information signs are also posted.  In addition, temporary traffic signals are in place at the intersection of Wellington Road 7 and Middlebrook Road/David Street West.  For additional information on this construction project, please click on the "Badley Bridge Construction" tab located under "Construction".

Wellington Road 124, Eramosa River Bridge B124135 

(Town of Erin)

Type of Work: Bridge replacement

Timing: June 24 to December (Phase 1)

Impact: This project conists of two phases which will last for two construction seasons.  The first phase starts on June 24.  The road will remain open with a traffic reduction to a single lane using signalized control of the flow of traffic across the bridge. 

The anticipated completion of Phase 1 is December, 2019.  Once complete, two lanes of traffic (one east/one west) will be re-established and maintained throughout Phase 2 until the end of construction in October, 2020. 

There will be traffic delays and the use of an alternate route is recommended.

Wellington Road 7, Woodisse Municipal Drain, 330 m East of Sideroad 12

(Township of Mapleton) 

Type of Work: Emergency culvert replacement

Timing: June 19 and June 20

Impact: The road is now open and construction is completed. 

Wellington Road 50, Culvert located just north of Sixth Line

(Town of Erin) 

Type of Work: Culvert replacement

Timing: August 20 to August 23

Impact: The road is now open and construction is completed.

Wellington Road 86, C086120

(Township of Mapleton)

Type of Work: Culvert replacement

Timing: September 9 to November 8

Impact: The road is now open and construction is completed.

 

Miscellaneous Road Projects

Rehabilitation of Highway 9, from Clifford to Harriston

Type of Work: Road reconstruction

Timing: May 6 to November, 2019

Impact:  During construction, Highway 9 traffic will be reduced to a single lane.  At times, Highway 9 will be closed to traffic and a detour route will be posted.  Advanced signage of closure dates will be provided by the Contractor.  Access to businesses and properties on Highway 9 will be maintained throughout construction.  For up-to-date information regarding this construction project, please click on the link below.

https://511on.ca/map#FutureRoadwork-MTO--22951

Winston Churchill Boulevard, from 1200 m south of Ballinafad Road to Olde Base Line Road

*Region of Peel Project and Location Map

Type of Work: Road reconstruction

Timing: May 2018 to approximately November 2019 (weather permitting)

Impact:  Winston Churchill Boulevard and 32 Sideroad/Ballinafad Road will be closed to through traffic from March 1, 2019 to November 29, 2019.  This is an extension of the original road closure.  Local access will be permitted from either end of the work zone.  A communication protocol has been established to ensure local residents know where the work zone is located and how to access their homes.

Garafraxa Street East (between Gartshore Street and Tom Street)

Township of Centre Wellington 

Type of Work: Construction of municipal services and sidewalk

Timing: May 27 to mid-July

Impact:  This road is now open.

Wellington Road 21 and Sideroad 4

Township of Centre Wellington

Type of Work: Inverhaugh Storm Outlet

Timing: July 29 to mid-October

Impact: This road is now open.

Tower Street (Highway 6)

Township of Centre Wellington 

Type of Work: Tower Street, Fergus Intersection Improvements

Timing: September 16 to mid-October

Impact:  This road is now open.

 

Road Resurfacing

 

 

 

Carry Over Projects 2018

Wellington Road 14, Gordonville Bridge B014005

Immediately north of Line 6, between Arthur and Conn (located over Four Mile Creek)

(Township of Wellington North)

Type of Work: Bridge replacement completion

Timing: Mid-May to Mid-July

Impact: Construction is completed.

Wellington Road 18 (St. Andrew Street), close to Beatty Line, on the south side of the road

(Township of Centre Wellington)

Type of Work: Retaining wall replacement completion

Timing: May to the end of June

Impact: Construction is completed.

Wellington Road 109 at Wellington Roads 7 and 123, Teviotdale Intersection

(Town of Minto/Township of Mapleton)

Type of Work: Roundabout construction completion

Timing: Summer of 2019

Impact: Construction is completed.

Wellington Road 124 at Kossuth Road (Waterloo Regional Road 31)

(Township of Guelph/Eramosa)

Type of Work: Roundabout construction completion

Timing: Summer of 2019

Impact: Construction is completed.

Wellington Road 124, east of Ospringe, between the Third and Fourth Lines

(Town of Erin)

Type of Work: Passing lane construction completion

Timing: Summer of 2019

Impact: Construction is completed.