2024 Construction Projects

Wellington Road 35 Paddock Bridge (B035087), Emergency Replacement
- Construction Progress Updates

Current Construction

Wellington Road 35, Paddock Bridge (B035087)
(Township of Puslinch)

Type of Work: Emergency Bridge Replacement

Timing: May 12 to Spring 2024

Impact: Due to structural deterioration, and as a measure to ensure public safety, Paddock Bridge on Wellington Road 35 between Concession 1 and Concession 2 will be closed until the bridge is replaced.

Traffic Impact: Wellington Road 35 will be closed to through traffic, with no emergency access, at the bridge location starting May 12, 2023. A detour route is posted taking the traveling public around the project site. The detour includes Concession 1, Concession Road 7 and Concession 2.

Detour Route

Construction Progress Updates

Wellington Road 42 at Wellington Road 24 Intersection and Ballinafad Culvert (B042111)
(Town of Erin/Town of Halton Hills)

Type of Work: Intersection Improvements and Culvert Rehabilitation

Timing: August 21 to/about March 2024

Impact: A contractor has been hired to complete improvements of the Wellington Road 42 (32 Side Rd/Halton-Erin Townline) at Wellington Road 24 (Trafalgar Rd) intersection and culvert rehabilitation works of Ballinafad culvert, located approximately 136m east of the intersection.

Traffic Impact: Delays are expected and the use of an alternate route is recommended. The intersection will remain open with one lane of traffic available at all times.

Future Road Construction

Wellington Road 7, Bosworth Bridge (B007028)
(Township of Mapleton)
Type of Work: Bridge Replacement
Wellington Road 7 at 1st Line
(Township of Centre Wellington)
Type of Work: Intersection Improvements
Wellington Road 11, 16th Line to Wellington Road 109 and Flax Bridge (B011025)
(Township of Mapleton)
Type of Work: Resurfacing and bridge rehabilitation
Wellington Road 17, Carroll Creek Bridge (B017114)
(Township of Mapleton)
Type of Work: Bridge Rehabilitation
Wellington Road 18, Orangeville Road to 0.6km East of Second Line
(Township of Centre Wellington)
Type of Work: Resurfacing
Wellington Road 18 at Wellington Road 29
(Township of Centre Wellington)
Type of Work: Intersection Improvements
Wellington Road 18 at Second Line
(Township of Centre Wellington)
Type of Work: Intersection Improvements
Wellington Road 18 at Wellington Road 26
(Township of Centre Wellington)
Type of Work: Intersection Improvements
Wellington Road 34, Irish Creek Bridge (B034123)
(Township of Puslinch)
Type of Work: Bridge rehabilitation
Wellington Road 109, Teviotdale to Harriston
(Town of Minto)
Type of Work: Resurfacing
Wellington Road 124, Fife Road to Whitelaw Road
(Township of Guelph-Eramosa)
Type of Work: Reconstruction
Pavement Overlay, Various Locations
Type of Work: Pavement Overlay

The Wastewater Treatment Plant Project, Town of Erin

Wastewater Treatment Plant
(Town of Erin) 

Type of Work: Sewage pumping station and linear works for the wastewater system

Timing: Fall 2022 to Fall 2024

Impact: The Town of Erin is undertaking a project to build a wastewater treatment plant to the Village of Erin and Hillsburgh. During this time, the following County of Wellington roads may be impacted by this work:

  • Trafalgar Road (Wellington Road 24), Hillsburgh

A full road closure is in effect from April 2023 to October 2024 on Trafalgar Road (WR 24) between Upper Canada Drive/Church Street and the Elora Cataract Trail access point.
More information under Miscellaneous Road Projects-Trafalgar Road (Wellington Road 24).

  • Main St (Wellington Road 124), Erin
  • Wellington Road 52, Erin
  • Winston Churchill Blvd (Wellington Road 25), Erin

Who to contact: The public is directed to the Town of Erin if they have any questions regarding this project.

Website: Wastewater Treatment Plant

Phone: 519.855.4407

Email: communications@erin.ca

FAQs: Frequently Asked Questions - Town of Erin

Miscellaneous Road Projects

Trafalgar Road (Wellington Road 24), Upper Canada Drive/Church St to Elora Cataract Trail
(Town of Erin)

Type of Work: Gravity Sewer

Project Lead: Town of Erin

Timing: April 2023 to October 2024

Impact: The Town of Erin's contractor will be installing a sanitary gravity sewer and watermain along Trafalgar Road (Wellington Road 24) in Hillsburgh, from Upper Canada Drive/Church St to the Elora Cataract Trail access point.

Traffic Impact: No through-traffic will be allowed through the work area, but access to local homes and businesses as well as emergency services will be maintained at all times.

The Town of Erin will make efforts to manage traffic around the work area. Road users should expect delays and increased traffic on Wellington Road 22, Sideroad 17, Wellington Road 124, Winston Churchill Blvd (Wellington Road 25) and Erin Garafraxa Townline.

Detour Information: Hillsburgh through-traffic along Trafalgar Road (Wellington Road 24) will be redirected to Winston Churchill Blvd (Wellington Road 25) via Wellington Road 22 and Erin Garafraxa Townline during the construction period. For more information on detour routes, visit the Wastewater Treatment Plant website listed below.

Who to contact: The public is directed to the Town of Erin if they have any questions regarding this project.

Website: Wastewater Treatment Plant

Construction Notice: Hillsburgh Gravity Sewer Construction Notice

Phone: (519) 855.4407

Email: communications@erin.ca

FAQs: Frequently Asked Questions - Town of Erin

© 2023 County of Wellington, 74 Woolwich St. Guelph, Ontario N1H 3T9, T 519.837.2600, TF 1.800.663.0750, F 519.837.1909