Wellington Road 7 Rothsay Bridge
The County of Wellington has initiated a Schedule B Municipal Class Environmental Assessment (EA) Study to confirm and document the existing structural deficiencies and identify alternative solutions, including rehabilitation or replacement and evaluate associated environmental impacts of the Rothsay Bridge located on Wellington Road 7, approximately 300 m west of Wellington Road 10, in the Township of Mapleton.

The Study
The Rothsay Bridge (No. B007019) consists of a single 18.3 m span steel pony truss structure with a concrete deck over the Mallet River. The bridge has a deck width of 8.3 m and was constructed circa 1952. The bridge is located on Wellington Road 7, approximately 300 m West of Wellington Road 10 in the Township of Mapleton. The study area extends approximately 0.5 km on either side of the bridge. In general, the structure is approaching the end of it’s originally intended
service life. As part of a bridge inspection conducted in 2025, the Rothsay Bridge, was found to be in fair to poor condition with major elements showing signs of significant deterioration. GFT has been retained by the County of Wellington to complete a Study to address these items.
The Process
In accordance with the requirements for Schedule B projects of the Municipal Class Environmental Assessment (as amended in 2015 & 2023). The Study will confirm and document the existing structural deficiencies and identify alternative solutions, including rehabilitation or replacement of the bridge, and evaluate associated environmental impacts.
Public Engagement and Consultation
A key component of the study will be consultation with interested stakeholders including public, agencies and Indigenous communities. We want to ensure that anyone with an interest in this study has the opportunity to provide input and feedback.
Comments Invited
An online comment form will be available on May 18th for a limited time.
Notice of Collection of Personal Information
Personal information is collected under the authority of the Environmental Assessment Act and will be used in the assessment process. With exception of personal information, all comments shall become part of the public records. Questions about this collection should be directed to the Project Manager listed in the notice.
Available Documentation
Contact Us
If you have any questions or concerns at any time during the study, or wish to be placed on the study mailing list to receive study notices directly, please contact either of the project team members below:
| Joe de Koning, P.Eng. Manager of Roads | William Van Ruyven, P.Eng., PMP Consultant Project Manager |
|---|---|
| County of Wellington 74 Woolwich Street Guelph ON N1H 3T9 Phone: (519) 837-2600 x2270 Email us | GFT 1 Adelaide Street East, Suite 2320 Toronto ON M5C 2V9 Phone: (437) 253-9279 Email: wvanruyven@gftinc.com |